Evolution pattern

Walk the previous tree node by node at the start of a new cycle.

Purpose

Bring an existing tree up to date before anything new is added to it. The group walks every problem of the previous version and gives each one a verdict: still true, changed, or resolved.

The walkthrough surfaces which nodes persisted, got resolved, and shifted. The difference between old and new versions says as much as either version does. See a living document.

When to use it

Timing

The time depends on the number of problems in the tree. Keep each one short: the group gives a verdict, not a discussion. A tree with 15 problems can take about 20 to 30 minutes to walk through.

Steps

  1. Save a copy of the tree, labeled with its date or planning cycle. From here on, the group edits the current version only.

  2. Show the tree as it was saved. Give the group 1 or 2 minutes to read it in silence.

  3. State the rule.

    We'll go through every problem and ask one question: still true, changed, or resolved? New nodes wait until we're done. Write them down so you don't lose them.

  4. Walk the problems one at a time, cluster by cluster. For each one, ask:

    Still true, changed, or resolved?

  5. Apply the verdict on the board right away.

    Verdict Meaning What happens on the board
    Still true The problem is as the node says The node stays
    Changed The problem is still there, in a different form The node is reworded and/or its arrows are redrawn
    Resolved The problem is gone The node is deleted along with any node that existed only for it
  6. Mark any problem the group cannot agree on within a minute, and come back to it after the walk.

  7. Read the result back: how many problems persisted, how many changed, and how many were resolved. Then open the board to new nodes.

Tips

Traps

Variations

Example

The renewals tree came back at quarterly planning in December, 3 months after the session that built it. The facilitator saved a copy, labeled "Renewals tree, September 2025," and walked the 14 problems with the same 12 leads. The diagram follows the walk through the support and deals corner.

Step 1 of 4. The September tree comes back in December. A copy is saved first, and nothing new is added yet.

The evolution pattern on the renewals tree, step 1 of 4: The September tree comes back in December. A copy is saved first, and nothing new is added yet. 9 nodes and 9 arrows: 4 root / problem, 3 action / intervention, 2 desired state / outcome. A text version follows the diagram. [P]Tier 1 supportcannot see acustomer's setup [A]Give tier 1read-only accessto the admintool [P]Sales promisescustom featuresto close deals [P]Large customersrun custom codepaths [P]Most tickets areescalated toengineering [A]Route customrequests througha deal desk [A]Write runbooksfor the 20 mostcommon tickets [O]Tier 1 resolves7 in 10 ticketson its own [O]Deals close onthe standardproduct Legend [P] Root / Problem [A] Action / Intervention [O] Desired State / Outcome Flow: roots (bottom) → outcomes (top).

Step 2 of 4. Tier 1 support cannot see a customer's setup: resolved. Tier 1 has had read-only access since October. The problem and its finished action leave the tree.

The evolution pattern on the renewals tree, step 2 of 4: Tier 1 support cannot see a customer's setup: resolved. Tier 1 has had read-only access since October. The problem and its finished action leave the tree. 7 nodes and 6 arrows: 3 root / problem, 2 action / intervention, 2 desired state / outcome. A text version follows the diagram. [P]Sales promisescustom featuresto close deals [P]Large customersrun custom codepaths [P]Most tickets areescalated toengineering [A]Route customrequests througha deal desk [A]Write runbooksfor the 20 mostcommon tickets [O]Tier 1 resolves7 in 10 ticketson its own [O]Deals close onthe standardproduct Legend [P] Root / Problem [A] Action / Intervention [O] Desired State / Outcome Flow: roots (bottom) → outcomes (top).

Step 3 of 4. Most tickets are escalated to engineering: changed. Escalations fell by half, and what remains is custom code. The node is reworded.

The evolution pattern on the renewals tree, step 3 of 4: Most tickets are escalated to engineering: changed. Escalations fell by half, and what remains is custom code. The node is reworded. 7 nodes and 6 arrows: 3 root / problem, 2 action / intervention, 2 desired state / outcome. A text version follows the diagram. [P]Sales promisescustom featuresto close deals [P]Large customersrun custom codepaths [P]Tickets aboutcustom code areescalated toengineering [A]Route customrequests througha deal desk [A]Write runbooksfor the 20 mostcommon tickets [O]Tier 1 resolves7 in 10 ticketson its own [O]Deals close onthe standardproduct Legend [P] Root / Problem [A] Action / Intervention [O] Desired State / Outcome Flow: roots (bottom) → outcomes (top).

Step 4 of 4. Sales promises custom features to close deals: still true, for a second cycle. Only after the walk does the group add what is new: large deals skip the deal desk.

The evolution pattern on the renewals tree, step 4 of 4: Sales promises custom features to close deals: still true, for a second cycle. Only after the walk does the group add what is new: large deals skip the deal desk. 8 nodes and 7 arrows: 4 root / problem, 2 action / intervention, 2 desired state / outcome. A text version follows the diagram. [P]Sales promisescustom featuresto close deals [P]Large customersrun custom codepaths [P]Tickets aboutcustom code areescalated toengineering [A]Route customrequests througha deal desk [A]Write runbooksfor the 20 mostcommon tickets [P]Large deals skipthe deal desk [O]Tier 1 resolves7 in 10 ticketson its own [O]Deals close onthe standardproduct Legend [P] Root / Problem [A] Action / Intervention [O] Desired State / Outcome Influences Blocks / Impedes Flow: roots (bottom) → outcomes (top).
Diagram as text: The evolution pattern on the renewals tree

Steps:

  1. Step 1: The September tree comes back in December. A copy is saved first, and nothing new is added yet.
  2. Step 2: Tier 1 support cannot see a customer's setup: resolved. Tier 1 has had read-only access since October. The problem and its finished action leave the tree. Changes: removed "Tier 1 support cannot see a customer's setup", "Give tier 1 read-only access to the admin tool". arrows removed: "Tier 1 support cannot see a customer's setup" influences "Most tickets are escalated to engineering"; "Tier 1 support cannot see a customer's setup" influences "Give tier 1 read-only access to the admin tool"; "Give tier 1 read-only access to the admin tool" influences "Write runbooks for the 20 most common tickets".
  3. Step 3: Most tickets are escalated to engineering: changed. Escalations fell by half, and what remains is custom code. The node is reworded. Changes: "Most tickets are escalated to engineering" now reads "Tickets about custom code are escalated to engineering".
  4. Step 4: Sales promises custom features to close deals: still true, for a second cycle. Only after the walk does the group add what is new: large deals skip the deal desk. Changes: added "Large deals skip the deal desk". new arrows: "Large deals skip the deal desk" blocks "Deals close on the standard product".

After the last step:

Nodes:

  • Root / Problem: "Sales promises custom features to close deals"
  • Root / Problem: "Large customers run custom code paths"
  • Root / Problem: "Tickets about custom code are escalated to engineering"
  • Root / Problem: "Large deals skip the deal desk"
  • Action / Intervention: "Route custom requests through a deal desk"
  • Action / Intervention: "Write runbooks for the 20 most common tickets"
  • Desired State / Outcome: "Tier 1 resolves 7 in 10 tickets on its own"
  • Desired State / Outcome: "Deals close on the standard product"

Arrows:

  • "Sales promises custom features to close deals" influences "Large customers run custom code paths"
  • "Large customers run custom code paths" influences "Tickets about custom code are escalated to engineering"
  • "Tickets about custom code are escalated to engineering" influences "Write runbooks for the 20 most common tickets"
  • "Write runbooks for the 20 most common tickets" influences "Tier 1 resolves 7 in 10 tickets on its own"
  • "Sales promises custom features to close deals" influences "Route custom requests through a deal desk"
  • "Route custom requests through a deal desk" influences "Deals close on the standard product"
  • "Large deals skip the deal desk" blocks "Deals close on the standard product"

Of the 14 problems, 3 were resolved, 1 had changed, and 10 were still true. The walk took 25 minutes.

Each resolved problem had a small, specific action aimed at it. The problems that persisted were the deep ones. "Sales promises custom features to close deals" was still true although its action, the deal desk, was up and running. The first new node of the review explained why: large deals skip the deal desk.